OPTIMIZATION OF THE MRICA RESERVOIR MANAGEMENT AT BANJARNEGARA REGENCY USING A DETERMINISTIC DYNAMIC PROGRAM (FOR ELECTRICITY PRODUCTION AND IRRIGATION WATER)
A Sastrawan1, L Makrup1, Ruzardi1, and S Fadilah1*
1Department of Civil Engineering, Universitas Islam Indonesia, Yogyakarta, Indonesia
[1]* Corresponding author’s email: [email protected]
DOI: https://doi.org/10.20885/icsbe.vol4.art21
ABSTRACT
Siltation becomes the Mrica reservoir’s main problem that causes the reduction of the effective storage capacity of the dam, so it cannot function properly. This research aims to obtain the optimal Reservoir Operating Rules that can produce maximum electrical power in hydropower and fulfill the irrigation water requirements as designed according to the existing reservoir capacity. The optimization method used in this research is a Deterministic Dynamic Program, assuming the event occurs as a certain occurrence. In this procedure, the existing constraints divide into multi-stages with decision variables at each stage. The analysis starts from a backward to a forward recursive to get the water storage and release maximum used as a recommendation to design the effective Reservoir Operation Rules. It was simulated using three scenarios, including Scenario 1 (Q IR optimization=actual); Scenario 2 (Q IR optimization=design); and Scenario 3(Q IR generate optimization=demand). Based on the benchmarking analysis results, the percentage of design, actual, and optimized Reservoir Operation Rules were 98.08%, 98.29%, and 99.04%, respectively, which indicates the design Reservoir Operational Rules performance is not better than others. Besides that, Scenario 2 has the highest profit of Rp 76350527181 and fulfills regulation No. 7 of 2004 concerning water resources.
Keywords : Optimization, Reservoir, Management
REFERENCES
Secretariat General National energy Council 2019 Indonesia Energy Outlook 2019 (Jakarta: Secretariat General National energy Council).
Utomo P. 2017 Mrica reservoir Sedimentation: Current Situation and Future Necessary Management. J. The Civil Engineering Forum. 3. 1.
Nurmansyah A S 2012 Aplikasi program dinamik dalam pengelolaan dan pengoperasian sumber daya air (Jakarta: FMIPA UNJ)
Ritonga A S 2015 Penerapan program dinamis untuk simulasi perencanaan pola tanam. J. Ilmu-Ilmu Teknik. 11
Purnamasari D A 2015 Optimasi pembangkit listrik tenaga air pada waduk kedungombo (Surakarta: UMS)
Nathalia P R K 2008 J. Teknik Sipil 8 pp. 225-236
Guntner A, Krol M S, Araujo J C D, Bronstrert A 2004. J. Hydrological Sci.49
Setiawan I R 1994 Pemrograman dinamik deterministik (Bogor: FMIPA IPB)
Hartono M 2005 Optimasi persediaan produk dengan permintaan yang fluktuatif menggunakan program dinamis (Malang: Teknik Mesin Politeknik Negeri Malang)
Istiarto 1992 Studi optimasi operasi reservoir pembangkit listrik (Yogyakarta: FT UGM)
Sekhar S C 2010 J. Bussiness Management 4 pp 882-885
Leave a Reply
Want to join the discussion?Feel free to contribute!