MODIFICATION OF BLASTING GEOMETRY TO INCREASE BLASTING EFFECTIVENESS IN QUARRY

B Sulistiyono[1]*, F Nugraheni2, M A Wibowo3, A Musyafa2

 

1 PT. Wijaya Karya

2 Universitas Islam Indonesia

3 Universitas Diponegoro

[1]* Corresponding author’s email: [email protected]

DOI: https://doi.org/10.20885/icsbe.vol2.art10

 

ABSTRACT

It is thought that a technique for carrying out blasting operations for rock extraction must be both effective and secure. It is intended that the blasting will be both safe and able to meet the needs of the stockpile material because the blasting area is adjacent to residential areas. This study intends to determine the cost and duration of the rock excavation work by blasting at the Trenggalek Tugu Dam Construction Project, as well as the effectiveness brought about by the implementation of modified blasting geometry. The inquiry was supported by descriptive and comparative methodologies. For this study, both quantitative and qualitative data were required. Quantitative data was gathered using working drawings, tool specifications, and material specifications; qualitative data was gathered using work procedures, specifications, and islands for related jobs. Quantitative information is obtained through the analysis of papers written by consultants and service providers. To acquire qualitative power, interviews with subject-matter experts and literature research were conducted. Because the work can be done more rapidly than with the prior geometry and because doing so has a lower cost analysis, the results reveal that using the modified geometry is more cost-effective than using the prior blasting geometry. Utilizing a combination of blasting geometry using the CJ Konya method and ICI-Explosive, there was a 9.3% acceleration in task execution and a 1.133% cost efficiency of the contract value (Trial & Error).

 

Keywords: Blasting, Construction; Cost-effective; Geometry

 

REFERENCES

Nurdianaa, A., and Setiabudi, B., (2018), Aplikasi manajemen risiko pada proyek jalan tol Semarang-Solo Ruas Bawen-Solo. Semarang
Darmawi, H., (2008), Manajemen Risiko, Bumi Aksara, Jakarta.
Abimanyu, D., Trides, T., Sakhdillah., (2018), Evaluasi geometri peledakan terhadap fragmentasi batuan dan biaya peledakan PT Teguh Sinarabadi, Kabupaten Kutai Barat Provinsi Kalimantan Timur. UPN Veteran Jogjakarta
Listine, D., Nurhakim., Dwiatmoko, M. U., Excelsior T.P3 (2015), Studi teknis penentuan geometri peledakan dan powder factor (pf) pada pembongkaran bijih besi di PT Putera Bara Mitra, Desa Mentawakan Mulya Kec. Mantewe, Kab. Tanah Bumbu, Kalimantan Selatan. UPN Veteran Jogjakarta
Sudarmono, D., (2013), Kajian Pengurangan Tingkat Getaran Tanah. Skripsi. Universitas Sriwijaya
Hartono, Rudi, (2018), Studi Metode Peledakan. Tesis. UPN Veteran Jogjakarta
Koesnaryo, S., (2001), Rancangan Peledakan Batuan, Jurusan Teknik Pertambangan, Fakultas Teknologi Mineral, Universitas Pembangunan Nasional “Veteran” Yogyakarta
Konya J. Calvin dan Edwaed J. Walter., (1990), Surface Blast Dessign, Prentce Hall, Inc New Jersey
Nurgaheni, Dewi. S., dan Utomo. C., (2011), Analisa Frekuensi Kejadian Risiko pada Pelaksanaan Pemasangan Samungan Pipa Air PDAM Surabaya, ITS, Surabaya.
Pemerintah Republik Indonesia, (2016), Peraturan Menteri Pertahanan Republik Indonesia No 5 Tahun 2016 tentang Pembinaan dan Pengembangan Industri Bahan Peledak. Jakarta: Kementrian Pertahanan Republik Indonesia
Pemerintah Republik Indonesia, (2017), Peraturan Kepala Kepolisian Republik Indonesia No 17 Tahun 2018 Tentang Perizinan, Pengamanan, Pengawasan dan Pengendalian Bahan Peledak Komersial. Jakarta: Kepolisian Republik Indosesia.
Ramli, (2011), Manajemen Risiko dalam Perspektif K3 OHS Risk Management, 2nd edition, Dian Rakyat, Jakarta.
Maryura. R., Toha. M. T., Sudarmono. D., (2013), Kajian pengurangan tingkat getaran tanah (ground vibration level) pada operasi peledakan interburden B2-C tambang batu bara Air Laya PT Bukit Asam (Persero), Tbk Tanjung Enim. PT Bukit Asam (Persero), Tbk. UPN Veteran Jogjakarta
Hartono. R., Panjaitan, Herdiansyah, (2018), Studi metode peledakan pada PT Pro Intertech Indonesia Kotamadya Sorong Provinsi Papua Barat. UPN Veteran Jogjakarta
Sakhdillah, (2018), Evaluasi Geometri Peledakan terhadap Fragmentasi Batuan dan Biaya Peledakan. Skripsi. Kalimantan
Sonhaji, (2011), Manajemen Risiko dalam Proyek Jalan Tol, Diskusi Panel Manajemen Risiko Jalan Tol di Teknik Sipil Undip 2 Mei 2011.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published.